A crane lifts a 614 kg roof 9.3 m high above the ground at a constant speed. It takes 48.4 seconds to do so.
Calculate the work done by the crane.

Respuesta :

Answer: W = 614 kg × 9.81 m/s² × 9.3 m

Explanation: work W is done against gravity. W = mgh

Time is needed to calculate work