sharmilapaulslg1986
sharmilapaulslg1986 sharmilapaulslg1986
  • 20-01-2022
  • Mathematics
contestada

X and Y together can complete a piece of work in 4 days. If X alone can

complete the same work in 12 days.

that work?
plz Do it step-by-step.​

Respuesta :

khevin2468 khevin2468
  • 20-01-2022
If your asking for how long it would take y to complete it
Answer:
If X can finish it in 12 days alone
In four days he can finish 4/12 or 33.33% of the work.
This means y finished 66.66% in four days.

4/x =66.66%
x=6

If they ask how long it would take Y to complete it alone
Answer:
So y would complete this work alone in 6 days

If they are asking for how much work each of them did in the four day
Answer:
Y did 66.66% in the 4 days and X did 33.33%
Answer Link

Otras preguntas

Do you think that's animals should be bred to develop a specific traits
Which phrase best completes the sentence? La clase de español es fácil pero las clases de biología _____. A. es difícils B. es difícil C. es difíciles D. so
What is factor sir 13?
What is the area of rectangle with length 18cm and width 4cm?
Which modern institution was born in medieval Europe?
can we prove LMN is congruent to XYZ ? if so, witch postulate can we use to do so ? if not , explain why.
Is 3/8 greater or less than 5/12
Which is a feature of balance in design? a. stability of elements on either side of an imagined vertical line b. recognizable arrangement of elements based on
A train travels 120 miles in one hour. what is its speed in miles per minute
A box contains 3 plain pencils and 7 pens. A second box contains 3 color pencils and 3 crayons. One item from each box is chosen at random. What is the