iriehsu4523 iriehsu4523
  • 18-02-2022
  • Business
contestada

The _______________ are the base of reference for determining responsibility and liability for actions by owner and contractor during the project period.

Respuesta :

palazzolorachel palazzolorachel
  • 18-02-2022

Answer:

Conditions of the contract

Explanation:

I hope this helps you:)

Answer Link

Otras preguntas

The English settlers were willing to fight for the land they wanted. What is the (effect)?
What is a close approximation of the circumference of a cake pan that is 9 inches across at its widest spot ? A) 14.2 inches B) 21.7 inches C) 28.3 inches D) 6
Quadratic formula X2-3x+2=0
The sum of the squares of two consecutive negative integers is 61. Find the smaller of the two integers
If a² = 12, then a4 =
Placing of a material in a new place is called _______.
A class survey showed 8 out of 25 students had plans to travel over spring break.how many student out of the 400 students in the entire school would you expect
A withdrawal of $50 is negative or positive?
Placing of a material in a new place is called _______.
Which of the following organisms has the highest evolutionary fitness? A. A cheetah that catches the most prey B. A fox that successfully avoids predators C. A