mikee1797 mikee1797
  • 19-07-2022
  • Mathematics
contestada

30men can do a piece of work in 40 days how long will it take to complete the work by 25 men

Respuesta :

hassanpaul24
hassanpaul24 hassanpaul24
  • 19-07-2022

Step-by-step explanation:

men × days=men1×days1

30×40=40×x

x=30days

Answer Link

Otras preguntas

Write the standard form of the line that passes through the given points. 4, 7) and (0, 7)
What is the term used to describe the sight variances in body temperature an individual can experience throughout the day?
A covalent bond between two atoms occurs when the atoms
Find the value of x or y so that the line through the points has the given slope. (17,9) and (2,y); slope: -1/3
To which graph does the point (2, 4) belong? y ≥ x + 3 y ≥ −x + 8 y ≥ 4x − 5 y ≥ −2x + 9
Barry collects 125cm^3 of honey a month. How many litres of honey will he make in a year?
which equation in point-slope form contains the point(-2,-6) and has slope -4?
The method of body composition measurement that sends a small current through the body to measure the resistance based on percentage of body water is
3p-(-20)=50 what is p?
Calculate the vapor pressure (in torr) at 298 k in a solution prepared by dissolving 15.3 g of the non-volatile non-electrolye urea {co(nh2)2} in 107 g of water