garybaker8696 garybaker8696
  • 19-08-2022
  • Computers and Technology
contestada

The process scheduler assigns the cpu to execute the processes for those jobs placed on the ____ queue by the job scheduler. a. ready b. waiting c. next d. process

Respuesta :

Otras preguntas

Between 1350 and 1600, what was going on in Europe?
Which best explains why sociological studies often provide different perspectives on society? O A. Just as there are different ways of viewing society, there ar
Who became president of the Confederacy in 1861? John C. Breckinridge Stephen Douglas Abraham Lincoln Jefferson Davis
087/the 7 is repeating as a fraction​
sharon wants to make a graph to show the relationship between the number of tickets sold and the price of tickets sold
Write an equation if the line that passes through (3,1) and (0,10)
what sequence of transformations on the red triangle will map it onto the missing portion of the square
jenna has 4 double fudge brownies to share with 5 people including yourself how can jenna share the brownies equally.
answer quick please and thank you
Roast me. Im a weeb, I play Fortnite, Apex cod and Overwatch, and my fav food is sourpatch and I burn ur nuggies if ur nice to me in replys >:)