activity b has a duration of 12 days and an earliest finish (ef) of 22 days. if b's latest start (ls) is 15 days, this must mean that b's slack (in days) is

Respuesta :

Otras preguntas

Which of the following points are solutions to the system of inequalities shown below?Check all that apply.y>6x + 5y<-6x + 7
The lymphatic system can best be compared to ______ because it ______. A- a series of caves; stores fluid until it has to be moved B- drain; moves fluid through
Why do you think the Dutch colonists agreed to become part of an English colony?
After a translation, the coordinates of the image of Segment AB are A' (6,8) and B' (9,8) . How many units up was Segment AB translated?
A horse gallops along a racecourse at a speed of 40km/h. It takes the horse 3 minutes to run the length of the track. Convert 3 minutes into hours.
HELP ASAP DUE TOMORROW!!! NUMBER 2!!
please help! not sure how to start.
When educating a student who lives in a crowded apartment and diagnosed with tuberculosis, the college school nurse will emphasize:?
The graph of the line with equation y = 7 x + 8 crosses the x-axis when x = ?
When it comes to transmitting STIs, it it not important how many sexual partners you had, as long as the sex was protexted