Three different activity times are needed for probabilistic time estimation. Match the term with the definition.
A) Pessimistic time
B) Most likely time
C) Optimistic time
D) Expected time

Respuesta :

Otras preguntas

Elaine is 8fears younger than her brother Tyler.the sum of their ages is 34.Define a variable and then write and solve an equation to find Elaine's and Tyler's
Janice thinks that 20 hundredths is equivalent to 2 thousandths because 20 hundreds is equal to 2 thousands. Use words and a place value chart to correct Janice
Which measurement would be least likely to be written in scientific notation: the thickness of a dog hair, the radius of a period on this page, the ounces in a
what is the value of 4x+9 if x=3?
What are two other names for rigid transformations?
Which is not produced by condensation? A. fog B. dew C. clouds D. smog
How can I divide thirty-three into two groups so the ratio is four to seven?
Which is not produced by condensation? A. fog B. dew C. clouds D. smog
A volleyball serve was in the air for 2.2 seconds before it landed untouched in the far corner of the  opponent’s court. What was the maximum height of the ser
What are two other names for rigid transformations?