Which of the following methodologies is appropriate for planning and controlling activities and resources in a system project?
A. Gantt charts
B. Program evaluation review technique (PERT)
C. Critical path methodology (CPM)
D. Function point analysis (FP)

Respuesta :

Otras preguntas

what is E=m² the famous theory of albert einstien?
what is a rational number between -1/6 and -2/6
What are the organelles of a cone cell?
Caitlyn did 6/7 of the problems on her math correctly and 4 incorrectly. She did all the problems. How many were there?
Caitlyn did 6/7 of the problems on her math correctly and 4 incorrectly. She did all the problems. How many were there?
Caitlyn did 6/7 of the problems on her math correctly and 4 incorrectly. She did all the problems. How many were there?
write a program in pascal to solve a quadratic equation
2 m3 of soil containing 35% sand was mixed into 6 m3 of soil containing 15% sand. what is the sand content of the mixture?
what is a rational number between -1/6 and -2/6
Ned weighs 1.5 times as much as Jill and Tom weighs 15 kilograms more than Jill. If their combined weight is 190 kilograms, how much does each person weigh?