glxbal9136 glxbal9136
  • 20-02-2024
  • Mathematics
contestada

A floor with an area of 10 m² can be tiled by 3 workers in 8 hours. Work out how long it would take 4 workers to tile a floor that is 25 m² Assume that all workers can tile at the same rate. ​

Respuesta :

Otras preguntas

Determine whether 128 feet, 136 feet, and 245 feet can be the lengths of the sides of a triangle.
what was the cheapest efficient mode of inland transportation in the 1800s
What are two contemporary social issues in schools
a football team loses an average of 3 yards per play. how many yards have they lost after 4 plays
The slope of the blue curve measures the plane’saltitude . the unit of measurement for the slope of the curve is
The 13th british colonies
In observational learning, who are the most effective models?
Asteroids were recently formed by the collision and breakup of an object orbiting in the asteriod belt. a. True b. False
Find the area A square with sides of length 13 yards Step by Step Solution
Why does gladwell use the word bargain instead of agreement or deal?