In a work breakdown structure, the sequence of tasks in which there is no slack is referred to as:

Respuesta :

Kalahira
Kalahira Kalahira
  • 25-10-2017
Critical path, the sequence of the tasks where there is no slack. Meaning if one task doesn't start on time because another has not yet been completed, there is no down time and there will inevitably be a delay in the project.
Answer Link

Otras preguntas

I'm bord can I to talk to some one
Gawain sa Pagkatuto Bilang 3: Gumuhit ng notes o rests na tutumbas ang bilang sa nasa larawan. Gawin ito sa inyong sagutang papel. Halimbawa: + 1 beat 1. 2. C 3
Pls help me Will mark you as brain plssss help me for these 2 questions just say top or bottom for which answers you pick
describe how the atoms in a compound are held together ​
"Packing is an important element of in the processing of medicinal plants" illustrate​
round 2.53 to the nearest two decimal places
Group the terms with the variable on one side of the equal sign and simplify. Do not solve. -5t-14=3t
Calculate the wavelength, in nanometers, of the light emitted by a hydrogen atom when its electron falls from the n = 7 to the n = 4 principal energy level.
simplify (4s + 7 - 2s) + 4(3s - 5)
Solve each equation. 1.) 12b+9=12b+11 2.) 6y-8=2(3y-4) 3.) -3k+4=-2-6k