If 7 workers took 48 days to complete a project in how many days would 12 workers complete the same project

Respuesta :

AL2006
AL2006 AL2006
  • 17-06-2018
7 workers take 48 days to do one full job.

Together, they do (1/48) of the job per day.

Each worker does (1/7) of (1/(48) = 1/(48·7) of the job per day.

12 workers would do (12 / (48·7) = 1/(4·7) = 1/28 of a job per day.

So it would take them 28 days to do one whole job. 
Answer Link

Otras preguntas

The story “Before Hip-Hop Was Hip-Hop” is narrated by Rebecca Walker and tells of her experience with the rise of Hip-Hop. This is considered the story’s A. The
Since civics includes the study of government, it has very little to do with one���s personal life.
Equity theory discusses individuals' perceptions about the relationship between ____ and ____.
Given the electric flux density, D=0.3r^2 ar nC/m^2 infree space, find total charge wothin the sphere r=3
An ocean wave has a wavelength of 2 meters and a period of 5 seconds. what is the speed of the wave? 0.4 m/s 2.5 m/s 10 m/s 50 m/s
Which of these is an example of interactions between the atmosphere and biosphere? Select one: a. formation of snow b. cracking of rocks due to heat c. destruct
Which constituent of bones is responsible for fat storage?
What is 5.2¯ expressed as a fraction in simplest form? 38/9 47/9 27/5 26/5
The major tissue that forms the skin is called a. connective. b. epithelial. c. muscle. d. nerve.
Which wave diagram represents the softest sound?