26jaidynabrooks
26jaidynabrooks 26jaidynabrooks
  • 17-12-2018
  • Mathematics
contestada

A road construction crew paves 1/5 mile every day. How much would they pave in 2 days?

Respuesta :

Ashrag253
Ashrag253 Ashrag253
  • 17-12-2018

Answer: 0.4 miles


Step-by-step explanation:

You can use the equation y=1/5x to help you figure it out where x is the days and y is the length. y=1/5(2). y=2/5 or 0.4 miles. Please vote my answer as brainliest

Answer Link

Otras preguntas

Which theme has Nathaniel Hawthorne depicted through the relationship between Goodman Brown and Faith in "Young Goodman Brown"? A. love B. adultery C. patriarch
state whether the lines represented by the equations y=1/2x-1 and y+4=-1/2(x-2) are paraller, perdendicular, or neither
The social class system in colonial Latin America closely resembles the structure of the _________ system in Europe.
Which statement accurately describes the presidential election process in the United States? A. A candidate can lose the popular vote but win the electoral vote
what is the surface area a circular spa with a 12 foot diameter with formula
at standard pressure when NaCl is added to water,the solution will have a
what is the function of the the capitalized word in the following sentence? the HISTORY test was harder than Daniel had anticipated. A.a noun functioning a ver
simplify: 3x^2-8x+4 and show work please
if a roasting is 600mm x 500mm how many 25cm cake time will fit on it?
What generalization can you make about the Union slave states? F. They share a border with free states to the north. G. They all border the Mississippi River. H