kendrickalexia5 kendrickalexia5
  • 17-01-2019
  • Computers and Technology
contestada

Which task should happen during the planning stage of a project

Respuesta :

ninjacatanimates
ninjacatanimates ninjacatanimates
  • 17-01-2019

There are a few of them, some are project initiation, project planning,  project execution, project monitoring and control, and project closure.  Hope it helps you! If it does it would be appreciated to be marked brainliest or some points! :D


Answer Link
rbpilot801 rbpilot801
  • 19-06-2021

Answer:

C

Explanation:

Answer Link

Otras preguntas

I have a Triangle and I need to find the side BC?
If  6m + 4 = 8m, then 4m
Flying against the wind a jet travels 7740 miles in 9 hours. Flying with the wind the same jet travels 4000 80 miles in 3 hours. What is the rate of the jet in
a farmer has 1235 trees to be planted on a rectangular parcel of land. if there are 24 trees planted in each row and each row must be completed before it is pla
There are 130 red, blue and green marbles in a bag. The ratio of red to blue to green is 5:3:2 respectively. How much marbles in the bag are blue?
A 15-foot ladder is leaning against a 30-foot wall. The bottom end of the ladder is 9 feet from the wall. How many feet above the ground does the ladder touch t
what is the difference between hyperbole and metaphor?
Write the ratio in lowest terms.  20:14a. (7/10)b. (20/14)c. (14/20)d. (10/7)
What does biodiversity mean
could you tell me what Is a Shiksa?