laylaud1p8Ylnhaina
laylaud1p8Ylnhaina laylaud1p8Ylnhaina
  • 19-05-2016
  • Business
contestada

Suggest one project that bricks construction could implement to address each key problem area listed in the scanario above

Respuesta :

andriansp andriansp
  • 01-06-2016
The projects that bricks construction can do are :
- Lack of housing >> They can provide more houses that available for their workers

- Unemployment >> They could teach some finance/entrepreneurial skills to the individuals nearby

- Poor Education and training >> They could build some sort of education center for specific job
Answer Link

Otras preguntas

what are the six steps to be followed in the bank reconciliation process​
What is the wavelength associated with 0.113kg ball traveling with velocity of 43 m/s?
como cambio de idioma la cuenta? todo me sale en ingles y lo quiero poner en español
For an employee training, the employee to instructor ratio is 24 to 2. If there are 39 instructors for the training, how many employees participated in the trai
can someone please help me​
Determine the resistance R when I = 1.5 A. 50 V – 30 V R I 20 Ω 10 Ω A.) 32 Ω B.) 8.0Ω C.) 40 ΩD.) 85 ΩE.) Ω 28 ​
Create the Equation: How many grams of Aluminum Chloride would be made from 42.7 L of Chlorine gas at STP reacting with 50.0 g of Aluminum? JUST THE ANSWER PLEA
find the volume of the figure. Round to the nearest hundredth if necessary. (figure is not to scale)​
I really want to know what 2+2 is.
The total bill for drinks and a pizza for three people is $1490 before tax the group wants to leave a 15% tip on the cost for the food, not including tax, what