what would be a standard way for anyone outside an agile team( for example, delivery partner partner of the account, head of the enablement function) to get the status of the work at any point in time?
​

Respuesta :

hayleejeanburcham
hayleejeanburcham hayleejeanburcham
  • 20-12-2019

Answer:

He/She can refer the physical/digital kanboard ,which is maintained by the team

Answer Link

Otras preguntas

One angle in a triangle measures twice the smallest angle whereas the largest angle is six times the small angle. Find the measures of all three angles.
1. What is the difference between a specific and a nonspecific defense?
x + y = 3k x - y = k
right answer gets brainliest :D (radical) √90 estimated to the nearest hundredth. thank you :3
List the 4 levels of organization in the human body from smallest to largest.give an example of each level.
What would happen if the kinase that adds the inhibitory phosphate to cdk were defective?
The process whereby the binding of antibodies to antigens causes rbcs to clump is called ________.
The angle of elevation at the top of a building is 34 degrees. At a point 80 feet closer , the angle of elevation to the top of the same building is 45 degrees.
Descriptions are rarely incorporated into longer documents; instead, they usually appear as separate documents. 1 point a. True b. False
Describe how a metamorphic rock might become a sedimentary rock over time.