griffgen000
griffgen000 griffgen000
  • 20-04-2020
  • Mathematics
contestada

A paving company was hired to make a 4 mile section of the highway. They need 700 tons of concrete to complete the job. How many pounds of concrete will they need to repave the highway?

Respuesta :

amberleighmcc1500
amberleighmcc1500 amberleighmcc1500
  • 20-04-2020

Answer:

they will need 1,400,000

Step-by-step explanation:

1 ton is 2,000 pounds. so 700x 2,000=1,400,000

Answer Link

Otras preguntas

The jargon in this excerpt makes the txt sound
Please help me ASAP I really need this answer.
lots of points Relative dating is done conducted by comparing a rock with a known age against a rock with an unknown age. ---Conclusion sentence: - = 3 facts
2 to the negative 3rd power represented another way
Wat religion practices the social caste system?
What is the distance between (2,-6) and (-4,8)
Mental illness can be categorized into three categories true or false
solve the system of linear equations -x=-6y+19 4=-4x-12y
Which coefficient before hydrogen (H2) balances this chemical equation? N2 + __H2 2NH3 A. 2 B. 3 C. 4 D. 5
Which line in this excerpt from act one of Shakespeare’s Romeo and Juliet contains alliteration?