g3ab0ionDoomsanbs
g3ab0ionDoomsanbs g3ab0ionDoomsanbs
  • 16-10-2016
  • Social Studies
contestada

The basic plan-do-study-act (pdsa) cycle was first developed by
a. deming
b. shewhart
c. juran
d. fleming.

Respuesta :

booglagoose booglagoose
  • 16-10-2016
a Deming and combined with c juran
Answer Link

Otras preguntas

describe the image using alliteration, preposition, metaphors
Anticipated consumer demand in a restaurant for free-range steaks next month can be modeled by a normal random variable with mean 1,200 pounds and standard devi
Government plz help! Giving brainlist three questions
Which of the following accurately lists the taxonomic groups in order from broad to specific? A.Kingdom, phylum, class, orderB.Class, domain, order, speciesC.Fa
Which type of resource are newspaper accounts written at the time an event occurred?
Why is getting a meeting request from a friend different from receiving one from an individual’s boss?
Which of the following parts of a tool would require the tool to have a guarding device?
2.1 million deaths per year. What is the quantity of deaths per minute
The temperature, t, in degrees Fahrenheit, can be found by counting the number of cricket chirps, c, heard in 14 seconds and then adding 40. The equation t = c
How do you play B sharp on the viola?