prakashsinghmalara
prakashsinghmalara prakashsinghmalara
  • 17-10-2021
  • Mathematics
contestada

A finishes a job in 10days,B finishes in 15days.if A and B work at it together, how many days will they take to complete the job​

Respuesta :

reinhard10158
reinhard10158 reinhard10158
  • 17-10-2021

Step-by-step explanation:

so, working together, in 1 day 1/10 + 1/15 of the work is done.

how many days (x) until we get 1/1 of the work done ?

x × (1/10 + 1/15) = 1

x × (3/30 + 2/30) = 1

x × 5/30 = 1

x×5 = 30

x = 30/5 = 6

so, together, they will finish the work in 6 days.

Answer Link

Otras preguntas

development occurs when the infant becomes aware of self and the surroundings.
What's the difference between the national budget process to the personal budget process
How did some southern states resist desegregation? how did president eisenhower respond to this resistance?
The graphs of the polar curves r = 4 and r = 3 + 2cosθ are shown in the figure above. The curves intersect at θ = π/3 and θ = 5π/3. (a) Let R be the shaded regi
The average of 3 numbers is 7. two of the numbers are 8 and 9. what is the third?
help fast pls! 30 points! Because the national government was not able to raise taxes under the Articles of Confederation, the states directly paid for eve
Which negative effects of grief influence physical health? Check all that apply.
What do the quantum numbers of electrons represent?
What were the positive effects of the transcontinental railroad?
a rock has a density of 15 g/cm3 and a mass of 50 g is dropped into a 100ml graduated cylinder containing 55 ml of water. to what height will the water rise in