morgancyrus
morgancyrus morgancyrus
  • 20-11-2021
  • Mathematics
contestada

PLS HELP
A certain job takes 2 people 50 hours to complete. How many people are needed to complete the job in 25 hours?

Respuesta :

crimsonkid521
crimsonkid521 crimsonkid521
  • 20-11-2021
Simple answer 1 because 50 divided by 25 is 2 so it takes one person because two people do it on 50 hours
Answer Link
diana061 diana061
  • 20-11-2021
Answer: 1 person. Each person takes 25 hours each for both people complete the 50 hour job, so for one person it’ll be 25 hours.
Answer Link

Otras preguntas

Give Reason:- 1)Vegetables release water after salt is added to them 2) Nucleus is absent in red blood cells 3) The skin of your fingers shrinks when you wash
How many legs do ladybugs have?
if n is a positive integer, for what values of n is the function f(x) =x to the power of na) evenb) odd
A martini glass has the shape of a cone (on a stem). If 1cm^3 =1mL, how many milliliters of liquid can the glass hold. Use x=3.14 (10.9 cm left to right) and
An automobile engine exerts a force of 595 N to propel the car at 90.0 km/h on a level road.  What is the power output of the engine at that time?
Kelly carried a box weighing 10 N the 200 meters from his car to his new house.  George took the box from Kelly and carried it up the 3 meter tall flight of sta
Kelly carried a box weighing 10 N the 200 meters from his car to his new house.  George took the box from Kelly and carried it up the 3 meter tall flight of sta
Find k if (x-3) is a factor of [tex] k^{2} x^{2} -kx-2[/tex].
Find the value of W if A=LW, A=8m^2, and L=4m PLEASE HELP
G=H(q+Q)for Q Solve for Q I dont understand how to do this.