junoyang503 junoyang503
  • 18-02-2022
  • Mathematics
contestada

Someone tell me the answer please

Someone tell me the answer please class=

Respuesta :

Esther
Esther Esther
  • 18-02-2022

Answer:

Step-by-step explanation:

Cost = 45 * hours worked (x) + 60

a) Cost = 45 * 2 + 60

                90 + 60 = 150

b) Cost = 45 * x + 60

  285 = 45x + 60

 - 60             -60

  225 = 45x

   /45    /45

    5 = x

   The job lasted 5 hours.

c) 60 represents the cost for hiring an electrician for 0 hours.

Hope that helps!

Answer Link

Otras preguntas

Please help meNa2SO3+...=H2SO4CaSO3+...=H2SO4SO2+...=MgSO3Ca3PO4=PH3PO4+...=Ca(H2PO4)2P+...=Mg3P2SiO2+...=Mg2Si
after an extreme disturbance, what kind of organisms move into the area first?
The sum of the squares of two consecutive negative integers is 61. Find the smaller of the two integers
In meters, the sides of a triangle measure 14,18 and 12. The length of the longest side of a similar triangle is 21 meters. a. Find the ratio of similitude of
Reptiles include which of the following? (1) crocodiles, (2) lizards, (3) snakes, (4) turtles. a. 1 and 2 b. 3 and 4 c. 1, 2, and 3 d. 1, 2, 3, and 4
A withdrawal of $50 is negative or positive?
Which US president in the 80's-90's whose son also became president?
A class survey showed 8 out of 25 students had plans to travel over spring break.how many student out of the 400 students in the entire school would you expect
A withdrawal of $50 is negative or positive?
Acceleration refers to a.increasing speed b.decreasing speed c.changing direction d.all of the above